Back to projects
ESF+ ActieMIN Power Apps
Summary
A team realisation project for ActieMIN, where a broad class team helped move existing Ninox-based workflows towards Microsoft Power Platform. Within this project, my main responsibility was the ESF+ Power Apps track, carried out with three other team members.
- Role
- Power Platform / ESF+ Team Member
- Timeline
- Academic project: 2025 — 2026
Tags
Preview
Overview
- ActieMIN supports people in need through food distribution and related assistance initiatives.
- The project replaced parts of the existing Ninox-based workflow with Microsoft Power Platform components.
- The full realisation was handled by a broad class team, with separate groups responsible for different functional areas.
- Our ESF+ team focused on the Power Apps implementation for stock, product, reservation and distribution processes.
My contribution
- Built and validated Power Apps screens.
- Worked on SharePoint-backed data handling.
- Implemented screen flows, forms and input validation.
- Tested user flows and corrected issues during the realisation phase.
- Prepared technical and user-facing handover material.
Outcome
- Delivered screens for stock management, product lookup, product creation, stock updates and reservations.
- Connected the app to SharePoint lists for operational data.
- Configured access for the relevant project roles and users.
- Delivered app packages, flow exports, SharePoint material and user/admin documentation.
Goal
- Support the transition from Ninox to Microsoft 365 and Power Platform.
- Create practical Power Apps support for stock, product and reservation workflows.
- Use SharePoint lists as structured data sources.
- Prepare the solution for use by volunteers and administrators.
Team context
This was a broad class-wide project for ActieMIN. My specific responsibility was the ESF+ Power Apps track, carried out with three other team members. Our work translated stock, product, reservation and distribution processes into usable Power Apps components and SharePoint-backed deliverables.
Approach
- Mapped the ESF+ process requirements to app screens and data structures.
- Divided the work across screens, forms, SharePoint lists, validation, testing and documentation.
- Built and tested the app iteratively based on feedback and workflow requirements.
- Prepared delivery material for final handover.
Artifacts
- Screenshots of stock management, product management and reservation screens.
- Power Apps editor screenshots showing screen structure and component tree.
- SharePoint lists for product, stock and reservation data.
- Power Automate flow exports, app packages and user/admin documentation.