Back to projects
ESF+ ActieMIN Realisation Phase
Summary
A team-based realisation project for an ESF+ context, focused on building and validating Power Apps support for stock management, reservations and operational workflows.
- Role
- Team Member – Realisation Phase
- Timeline
- Academic project
Tags
Goal
- Translate the ESF+ process needs into usable digital support.
- Support volunteers and administrators with stock and reservation workflows.
- Create a practical low-code solution that matched the realisation-phase requirements.
- Keep the solution understandable for non-technical users.
Planning
- Worked as a team during the realisation phase of the ESF+ project.
- Divided responsibilities across Power Apps screens, data handling, access and documentation.
- Built and tested the solution iteratively based on project needs.
- Prepared app files, documentation and supporting material for delivery.
Results
- Delivered Power Apps components for stock management and reservations.
- Provided screens for product lookup, stock updates and reservation handling.
- Configured shared access for project roles, administrators and users.
- Delivered app packages, flow material and supporting documentation through SharePoint.
Team context
This was a team project. The team was mainly responsible during the ESF+ realisation phase, where the process design was translated into working Power Apps components and deliverables.
Overview
- The project supported an ESF+ initiative linked to food distribution and assistance for people in need.
- The solution was aimed at volunteers, administrators and project stakeholders.
- Power Apps was used to create practical workflow support without building a full custom application.
- The team focused on making the realisation phase concrete and demonstrable.
Evidence
- Screenshots of Power Apps stock management, product management and reservation screens.
- Screenshots showing product creation, product editing, stock actions and reservation handling.
- Power Apps editor screenshot showing the reservation screen structure.
- Delivered documentation for administrators and users.
Contribution
- Contributed as part of the team responsible for the ESF+ realisation phase.
- Helped build and validate Power Apps screens for stock and reservation flows.
- Supported access setup and sharing of the applications with the correct groups.
- Helped prepare SharePoint deliverables such as app packages, flow exports and documentation.